Commercial Popcorn Machine/ Popcorn Maker machine

  • 5 - 19 Cartons
    $165.00
  • 20 - 49 Cartons
    $135.00
  • >=50 Cartons
    $107.00
Model Number:
GT-POP09
Machinery Capacity:
1
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China
Voltage:
110V/220V
Power(W):
1450w
Dimension(L*W*H):
560x420x720mm
Weight:
19
Certification:
CE Certificate
Warranty:
1 Year
After-sales Service Provided:
Online support
Application fields:
Snack food factory, Commercial catering
Condition:
New
Application:
Popcorn
Product name:
Pocorn Making Machine
Color:
Red
Type:
Fully Automatic
Capacity:
8OZ
Function:
Heat
Usage:
Catering
Name:
Food Cart
Raw material:
dry sweet corns
Supply Ability
Supply Ability:
50 Carton/Cartons per Week
Packaging & Delivery
Packaging Details
Carton box with wooden frame.
Also accept special package request
Port
Guangzhou
Product Description
Our products are environment-friendly with excellent designs. High technique to save power, complete functions, easy to operate, our products are more competitive than those of the same line in the international market.
Commercial Popcorn Machine/ Popcorn Maker machine

                                           

 

ModelVoltagePowerN.W.G.W.Packing Size
GT-POP09110V/220V1500W18kg20kg615*510*825MM
GT-POP08110V/220V1500W18kg20kg615*510*825MM

 

Product Details F

 

 

Hot products

Packaging & Shipping

Our popcorn machine's packing is suitable for shipping. 

 

Certifications

 

Company Information

 

FAQ

FAQ

What Methods of Payment Are Acceptable?

1. Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders.

2. Western Union: we accept 100% payment via the western union.

 

What Is the Cost of Shipping?

Shipping cost is based on the following elements:

Number of packages

Gross Weight

Package volume

Destination port

 

How About the Delivery Time?

Some of the products are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time ~35 days depends on your requirement on the product.